Repairing a deformed non-aligned drive shaft Ø 110mm length 200mm on a silo for biowaste
Preparing the shaft for welding. Taped thread, copper pieces inserted in both keyways.
Welding of the shaft end
Attaching and aligning the front bearing
for the shaft processing machine
Mobile machining of the drive shaft
Welded and mobile
machined drive shaft
Drive unit mounted on silo
and ready for trial run